PR South-Muntenia — electric charging stations on county roads (call PRSM/908)

Local authorities (UAT) in South-Muntenia can obtain €50,000–€300,000 in non-refundable funding, with no co-financing, for electric charging stations along county roads. Call PRSM/908 has €2,470,588.24 and accepts projects until 2 December 2026, 14:00.

Who can apply
Administrative-territorial units (UAT) in the counties of Argeș, Călărași, Dâmbovița, Giurgiu, Ialomița, Prahova and…
Total budget
2,470,588.24 € (2,100,000 € ERDF and 370,588.24 € from the state budget)
Funding amount
Between €50,000 and €300,000 non-refundable per project
Submission period
2 June 2026, 08:00 – 2 December 2026, 14:00

Checked against official sources on · funder: ADR South-Muntenia · official source

59 days left until the deadline 183-day window

The call window is open. The time left until the deadline decides whether we can still build your application in time, so call today.

PR South-Muntenia: €2.47 million for electric charging stations on county roads, deadline 2 December

Who can apply

Administrative-territorial units (UAT) in the counties of Argeș, Călărași, Dâmbovița, Giurgiu, Ialomița, Prahova and Teleorman: county councils, municipalities, towns and communes. They can apply on their own or in partnership with each other. Private companies are not eligible applicants. The stations must be located along county roads, in urban or rural areas.

What it covers

  • Normal and high-power charging infrastructure for light and heavy electric vehicles
  • Equipment, installations and fittings for installing and operating the stations
  • Software, licences and similar rights required for operation
  • Construction and installation works, including connection to the electricity grid
  • Setting up the parking spaces associated with the stations
  • Road safety measures on the county road: pavements, lay-bys, dedicated lanes, markings, speed limiters, lighting, retroreflective materials
Full analysis PR South-Muntenia: €2.47 million for electric charging stations on county roads, deadline 2 December Conditions, steps and pitfalls, with official sources →

Apply in the current call window

  1. We analyse whether you qualify and under which programme exactly.
  2. We build the application: business plan, budget, supporting documents.
  3. We submit during the call window and follow the evaluation.
  4. We stay with you through the reimbursement file and final payment.

Frequently asked questions

Does the town hall have to contribute its own funds to call PRSM/908?

For eligible costs, no: the official call page states beneficiary co-financing of 0%. However, ineligible costs, such as works exceeding the guide's ceilings, and any budget overruns are covered from the local budget.

Can a small commune in South-Muntenia submit a charging station project on its own?

Yes. Communes are eligible applicants individually, as are towns, municipalities and the county councils of Argeș, Călărași, Dâmbovița, Giurgiu, Ialomița, Prahova and Teleorman. The condition is that the investment targets charging infrastructure along a county road in the region.

Can private companies or charging station operators apply?

No. Call PRSM/908 is intended exclusively for administrative-territorial units (UAT) and partnerships between them. Private companies that want charging stations should look at other programmes, for example the national ones for charging infrastructure, such as e-Mobility RO.

What are the minimum and maximum amounts per project?

The non-refundable value is a minimum of 50,000 € and a maximum of 300,000 € per project. The total budget of the call is 2,470,588.24 €, of which 2,100,000 € ERDF and 370,588.24 € from the state budget.

By when and how are projects submitted?

Funding applications are submitted electronically, through MySMIS2021, between 2 June 2026, 08:00, and 2 December 2026, 14:00. The call is competitive, so projects are assessed and ranked after submission, not in order of arrival.

What type of charging stations does the call fund?

The call funds normal and high-power charging infrastructure for light and heavy electric vehicles, located along county roads in South-Muntenia. The implementation area may be urban or rural, and besides the stations, grid connection, associated parking and road safety measures can also be funded.

How long does it take to prepare the application?

It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.

What happens if I do not qualify?

We tell you before any contract is signed, and if another suitable programme exists, we point you to it.

Next step

Apply in the current call window — PR South-Muntenia — electric charging stations on county roads (call PRSM/908)

Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.