Skip to content
Todos & Company
Call window open

PDDTJ Prahova — energy renovation of residential blocks of flats

Local authorities (UAT) in Prahova can obtain between 200,000 and 15,000,000 euro in non-refundable funding per project for the energy renovation of blocks of flats. The budget is 18.68 million euro (PDDTJ). Applications must be submitted by 3 February 2027, 17:00.

Who can apply
Only the territorial administrative units (UAT) of Prahova county can apply
Total budget
€18,684,371.76, non-refundable (allocation for Prahova)
Funding amount
Non-refundable funding between 200,000 and 15,000,000 euro per project (lei equivalent)
Submission period
19 August 2026, 17:00 – 3 February 2027, 17:00

Checked against official sources on · funder: MIPE (Ministry of Investments and European Projects) · official source

122 days left until the deadline 168-day window

The call window is open. The time left until the deadline decides whether we can still build your application in time, so call today.

PTJ Prahova: €18.68 million for the energy renovation of blocks of flats, applications until 3 February

Who can apply

Only administrative-territorial units (UAT) in Prahova county can apply: communes, towns, municipalities and the county seat municipality. A project may cover several blocks of flats ("components"), up to a maximum of 20 per project.

What it covers

  • Minor, moderate or deep energy renovation of multi-family residential buildings
  • Blocks where the works reduce primary energy consumption and CO2 emissions by at least 30% (exception: historic monuments and buildings in protected built-up areas)
  • Blocks with a specific final energy consumption of at least 200 kWh/m²/year at submission, according to the energy audit
  • Projects with several blocks (maximum 20 components per project)
  • Blocks whose technical and economic documentation was prepared under the PNRR call, accepted without being redone if it meets the guide's requirements
Full analysis PTJ Prahova: €18.68 million for the energy renovation of blocks of flats, applications until 3 February Conditions, steps and pitfalls, with official sources →

Apply in the current call window

  1. We analyse whether you qualify and under which programme exactly.
  2. We build the application: business plan, budget, supporting documents.
  3. We submit during the call window and follow the evaluation.
  4. We stay with you through the reimbursement file and final payment.

Frequently asked questions

What is the deadline for applications for the energy renovation of blocks of flats in Prahova under the PDDTJ?

Funding applications can be submitted between 19 August 2026, 17:00, and 3 February 2027, 17:00, according to ADR Sud-Muntenia (Regional Development Agency South-Muntenia), the programme's intermediate body.

How much can a block-of-flats energy renovation project receive under the PDDTJ in Prahova?

A project can receive between €200,000 and €15,000,000 in non-refundable funding (lei equivalent). The applicant must provide an own contribution of at least 2% of total eligible costs. The total budget for Prahova is €18,684,371.76.

Who can submit a funding application?

Only administrative-territorial units (UAT) in Prahova county can submit applications: communes, towns, municipalities and the county seat municipality. A project may include up to 20 blocks (components).

What energy requirements must a block meet?

At submission, the block must have a specific final energy consumption of at least 200 kWh/m²/year, according to the energy audit. The works must reduce primary energy consumption and CO2 emissions by at least 30%. Historic monuments and buildings in protected built-up areas are an exception: they receive 0 points for this criterion but are not rejected.

What does the condition of 20% of apartments belonging to people receiving social assistance mean?

At least 20% of the apartments in each block must belong to people to whom the UAT provides social assistance. The threshold must be met up to and including contracting. If the share falls below 20% after submission, the UAT notifies the MA/IB within 5 working days, and the block is rejected. Blocks prepared under the PNRR call are exempt from the threshold and automatically receive the maximum score for this criterion.

Can I use the documentation prepared for the PNRR?

Yes. Technical and economic documentation prepared and accepted under the PNRR call (feasibility study/DALI/technical design, energy audit, energy performance certificate, technical expertise) is accepted without being redone. The condition is that the applicant demonstrates alignment with the technical requirements and indicators in the guide. Anything missing is completed.

How long does it take to prepare the application?

It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.

What happens if I do not qualify?

We tell you before any contract is signed, and if another suitable programme exists, we point you to it.

Next step

Apply in the current call window — PDDTJ Prahova — energy renovation of residential blocks of flats

Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.

or call us directly on 0755 167 167