GAL Vrancea Sud-Est — I.1 – Increasing renewable energy production capacity
GAL Vrancea Sud-Est is opening I.1 (renewable energy, non-productive investments/in the community's interest): 96,509 euro, 100%, online submission 8 October–6 November 2026.
- Who can apply
- The announcement does not specify the type of applicants
- Total budget
- 96,509 euro
- Funding amount
- Maximum 96,509 euro per project
- Submission period
- 8 October 2026 – 6 November 2026, 23:59
Checked against official sources on · funder: GAL Vrancea Sud-Est · official source
The guide has not been published yet, but good applications are built before launch. Those who start when the call window opens usually miss out on it.
Who can apply
The announcement does not specify the type of applicants. The intervention is marked as social / community-interest / non-productive investments, and the support rate is 100%. The exact eligibility must be checked in the Applicant's Guide, which is not among the documents. GAL Vrancea Sud-Est territory (these localities only): Bălești, Ciorăști, Gologanu, Gugești, Măicănești, Milcovul, Nănești, Răstoaca, Sihlea, Slobozia Ciorăști, Tătăranu, Vulturu, Măxineni, Salcia Tudor, Scorțaru Nou, Nămoloasa.
What it covers
- Operations related to renewable energy production capacities, including those based on bioproducts (code L803)
- Social / community-interest / non-productive investments
- The exact eligible costs are not detailed in the notice
We prepare your application before the window opens
- We analyse whether you qualify and under which programme exactly.
- We build the application: business plan, budget, supporting documents.
- We submit during the call window and follow the evaluation.
- We stay with you through the reimbursement file and final payment.
Frequently asked questions
When are applications for I.1 submitted to GAL Vrancea Sud-Est?
Submission opens on 8 October 2026 at 09:00 and closes on 6 November 2026 at 23:59, i.e. 30 calendar days.
What is the allocation and the maximum value per project?
The call window allocation is 96,509 euro, and the maximum non-refundable amount per project is also 96,509 euro. The support rate is 100%.
What is the minimum selection threshold?
The minimum threshold is 40.00 points. The evaluation takes a maximum of 40 calendar days, and appeals are submitted within 5 calendar days.
Where can I get further information?
At the GAL office at Strada Milcov no. 2, Răstoaca, Vrancea, Monday–Friday 08:00–12:00, by phone on 0784287435 / 0784287437 or by e-mail at galvnsudest@gmail.com. The GAL replies within 5 calendar days.
How long does it take to prepare the application?
It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.
What happens if I do not qualify?
We tell you before any contract is signed, and if another suitable programme exists, we point you to it.
Next step
We prepare your file until the call opens — GAL Vrancea Sud-Est — I.1 – Increasing renewable energy production capacity
Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.
or call us directly on 0755 167 167
Other programmes
e-DRIVE — replacing the fleets of businesses and passenger transport vehicles with zero-emission vehicles
A scheme of 56.9 million euro from the Modernisation Fund. It funds up to 100% of eligible costs for M1, M2 and M3 electric vehicles replacing polluting vehicles. The scheme has been approved (OMTI 742/2026, 817/2026), but the guide and the calls have not yet been published.
Call window openModernisation Fund — stand-alone battery storage installations
The Ministry of Energy is offering 150 million euro from the Modernisation Fund for new stand-alone battery storage installations owned by companies with CAEN code 35. The aid covers up to 100% of eligible costs, with a maximum of 69,000 euro/MWh and 15 million euro per company.
Opening soone-MOVE RO — charging infrastructure for zero-emission mobility
Non-refundable state aid of 262 million euro from the Modernisation Fund for electric charging stations for fleets and the public, with photovoltaics and storage. It is awarded through competitive tenders. The scheme has been approved, but the call has not yet been launched.