GAL Vrancea Sud-Est — I.1 – Increasing renewable energy production capacity
GAL Vrancea Sud-Est is opening I.1 (renewable energy, non-productive investments/in the community's interest): 96,509 euro, 100%, online submission 8 October–6 November 2026.
- Who can apply
- The announcement does not specify the type of applicants
- Total budget
- 96,509 euro
- Funding amount
- Maximum 96,509 euro per project
- Submission period
- 8 October 2026 – 6 November 2026, 23:59
Checked against official sources on · funder: LAG (Local Action Group, GAL) Vrancea Sud-Est · official source
This call window has closed. Most programmes reopen — we will notify you in good time and prepare your application before it does.
Who can apply
The announcement does not specify the type of applicants. The intervention is marked as social / community-interest / non-productive investments, and the support rate is 100%. The exact eligibility must be checked in the Applicant's Guide, which is not among the documents. GAL Vrancea Sud-Est territory (these localities only): Bălești, Ciorăști, Gologanu, Gugești, Măicănești, Milcovul, Nănești, Răstoaca, Sihlea, Slobozia Ciorăști, Tătăranu, Vulturu, Măxineni, Salcia Tudor, Scorțaru Nou, Nămoloasa.
What it covers
- Operations related to renewable energy production capacities, including those based on bioproducts (code L803)
- Social / community-interest / non-productive investments
- The exact eligible costs are not detailed in the notice
Free assessment · 2 minutes
Check whether your company qualifies
Enter your CUI (tax ID): we'll show you instantly whether LAG (Local Action Group, GAL) Vrancea Sud-Est — I.1 – Increasing renewable energy production capacity applies in your company's county and field, then a consultant will call you free of charge.
A Todos & Company consultant will contact you within one working day at the details in your subscription.
We will notify you of the next round
- We analyse whether you qualify and under which programme exactly.
- We build the application: business plan, budget, supporting documents.
- We submit during the call window and follow the evaluation.
- We stay with you through the reimbursement file and final payment.
Frequently asked questions
When are applications for I.1 submitted to GAL Vrancea Sud-Est?
Submission opens on 8 October 2026 at 09:00 and closes on 6 November 2026 at 23:59, i.e. 30 calendar days.
What is the allocation and the maximum value per project?
The call window allocation is 96,509 euro, and the maximum non-refundable amount per project is also 96,509 euro. The support rate is 100%.
What is the minimum selection threshold?
The minimum threshold is 40.00 points. The evaluation takes a maximum of 40 calendar days, and appeals are submitted within 5 calendar days.
Where can I get further information?
At the GAL office at Strada Milcov no. 2, Răstoaca, Vrancea, Monday–Friday 08:00–12:00, by phone on 0784287435 / 0784287437 or by e-mail at galvnsudest@gmail.com. The GAL replies within 5 calendar days.
How long does it take to prepare the application?
It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.
What happens if I do not qualify?
We tell you before any contract is signed, and if another suitable programme exists, we point you to it.
Funding alerts · free
Not the right programme? Get alerts for your company
Enter your CUI (tax ID): once a month or every two weeks, we will send you the programmes that are open or opening for your company's county and field. Free of charge, and you can unsubscribe at any time.
Emails come from alerte@todos-company.ro; replies go to our consultants.
Next step
We will notify you in the next round — LAG Vrancea Sud-Est (GAL) — I.1 – Increasing renewable energy production capacity
Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.
or call us directly on 0755 167 167
Other programmes
e-DRIVE — replacing the fleets of businesses and road passenger transport vehicles with zero-emission vehicles
State aid and de minimis aid scheme from the Modernisation Fund for replacing fleets with zero-emission vehicles. The guides for Measures 1 and 2 are in consultation until 18 November 2026; the submission timetable has not been announced.
Call window openModernisation Fund — stand-alone battery storage installations
The Ministry of Energy is funding new stand-alone battery storage installations of at least 1 MW with €150 million from the Modernisation Fund. Applications in MySMIS2021 are open until 15 November 2026, 23:59.
Opening soone-MOVE RO — charging infrastructure for zero-emission mobility
Non-refundable state aid of 262 million euro from the Modernisation Fund for electric charging stations for fleets and the public, with photovoltaics and storage. It is awarded through competitive tenders. The scheme has been approved, but the call has not yet been launched.