Modernisation Fund — stand-alone battery storage installations

The Ministry of Energy is offering 150 million euro from the Modernisation Fund for new stand-alone battery storage installations owned by companies with CAEN code 35. The aid covers up to 100% of eligible costs, with a maximum of 69,000 euro/MWh and 15 million euro per company.

Who can apply
Micro-enterprises, SMEs and large enterprises whose articles of association include activities under CAEN division…
Total budget
The lei equivalent of 150,000,000 euro
Funding amount
Up to 100% of eligible costs, capped at 69,000 euro per MWh of installed storage and at…
Submission period
1 September 2026, 12:00 – 30 October 2026, 14:00

Checked against official sources on · funder: Ministry of Energy · official source

26 days left until the deadline 59-day window

The call window is open. The time left until the deadline decides whether we can still build your application in time, so call today.

Six drawn storage cells with different charge levels
Stand-alone battery storage: 150 million euro from the Modernisation Fund, deadline 30 October

Who can apply

Micro-enterprises, SMEs and large enterprises whose articles of association include activities under CAEN division 35 (production and sale of electricity). Newly established companies may also apply, provided they have a subscribed and paid-up share capital of at least 100,000 lei. The applicant must be registered with the ONRC (Trade Register) in Romania by the signing of the funding contract at the latest. Projects may only be submitted individually, without partnerships.

What it covers

  • Construction of new stand-alone battery storage installations for electricity
  • Installations with an installed capacity of at least 1 MW (each one, if aggregated)
  • Capacity-to-power ratio of at least 2:1 (MWh/MW)
  • Installations with their own grid connection and dedicated metering, connected to the transmission or distribution network
  • Purchase of new installations and equipment
  • Construction works forming part of the storage project
Full analysis Stand-alone battery storage: 150 million euro from the Modernisation Fund, deadline 30 October Conditions, steps and pitfalls, with official sources →

Apply in the current call window

  1. We analyse whether you qualify and under which programme exactly.
  2. We build the application: business plan, budget, supporting documents.
  3. We submit during the call window and follow the evaluation.
  4. We stay with you through the reimbursement file and final payment.

Frequently asked questions

Until when can projects for stand-alone battery storage be submitted?

Funding applications are submitted on the MySMIS2021 platform (https://mysmis2021.gov.ro/) between 1 September 2026, 12:00, and 30 October 2026, 14:00. Projects submitted outside this period are automatically rejected.

How much can a company receive for a battery storage installation?

The aid may cover up to 100% of eligible costs, but no more than 69,000 euro per MWh of installed storage and no more than 15,000,000 euro per enterprise, regardless of the number of projects submitted. The amount is granted in lei, at the rate of 1 euro = 5.2434 lei.

Who can apply to the 150 million euro call for stand-alone batteries?

Enterprises of any size, including newly established ones, whose articles of association include activities under CAEN division 35, can apply. Newly established companies must have a subscribed and paid-up share capital of at least 100,000 lei. Partnerships are not accepted.

What technical conditions must the storage installation meet?

The installation must be new and stand-alone, with an installed capacity of at least 1 MW and a capacity-to-power ratio of at least 2:1, meaning at least two hours of operation at installed capacity. It must have a dedicated technical connection permit, its own grid connection and dedicated metering, with no direct link to a producer or a consumer.

How are projects selected?

Selection is by competitive bidding. The selection criterion is the amount of state aid requested in euro per MWh of installed storage, so a lower request per MWh improves your chances of funding.

Can I start works or order the batteries before submission?

No. If works begin before the application is submitted, the project is excluded. This includes the first firm commitment to order equipment. Buying land, obtaining permits and the feasibility study are not considered the start of works.

How long does it take to prepare the application?

It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.

What happens if I do not qualify?

We tell you before any contract is signed, and if another suitable programme exists, we point you to it.

Next step

Apply in the current call window — Modernisation Fund — stand-alone battery storage installations

Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.

or call us directly on 0755 167 167