GAL Drumurile Bistriței — L803 (EAFRD Intervention no. 1) – Environmental protection and climate change mitigation…
GAL Drumurile Bistriței call (open) for environmental protection and sustainable energy. Allocation 67,884 euro, max. 30,000 per project, 100% support. Online submission until 29 October 2026, 23:59.
- Who can apply
- The announcement does not specify the type of applicant
- Total budget
- 67,884 euro
- Funding amount
- Maximum 30,000 (maximum non-refundable amount per project) per project
- Submission period
- 30 September 2026 – 29 October 2026, 23:59
Checked against official sources on · funder: GAL Drumurile Bistriței · official source
The call window is open. The time left until the deadline decides whether we can still build your application in time, so call today.
Who can apply
The announcement does not specify the type of applicant. The intervention is marked as social / in the community interest / non-productive, and the support rate is 100%. The exact conditions are set out in the Applicant's Guide, which is not included in the documents. Territory of the GAL Drumurile Bistriței (these localities only): Alexandru cel Bun, Bahna, Borlești, Cândești, Costișa, Dochia, Mărgineni, Moldoveni, Piatra Șoimului, Podoleni, Rediu, Români, Săvinești, Tazlău, Zănești, Roznov, Filipești.
What it covers
- Investments in sustainable energy production (according to the title of the intervention)
- Environmental protection and climate change mitigation projects
- The exact costs are set out in the Applicant's Guide
Apply in the current call window
- We analyse whether you qualify and under which programme exactly.
- We build the application: business plan, budget, supporting documents.
- We submit during the call window and follow the evaluation.
- We stay with you through the reimbursement file and final payment.
Frequently asked questions
What is the deadline for submitting sustainable energy projects to GAL Drumurile Bistriței?
Online submission at www.afir.ro opened on 30 September 2026 at 09:00 and closes on 29 October 2026 at 23:59.
What is the allocation and the maximum project value?
The call window allocation is 67,884 euro, and the maximum non-refundable amount per project is 30,000. The support rate is 100%.
What is the minimum selection threshold?
The minimum threshold is 30.00 points. The scoring grid is not included in the announcement.
What type of intervention is it?
The announcement marks the intervention as a social / community-interest / non-productive investment, with code L803 and no additional coding.
How long does it take to prepare the application?
It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.
What happens if I do not qualify?
We tell you before any contract is signed, and if another suitable programme exists, we point you to it.
Next step
Apply in the current call window — GAL Drumurile Bistriței — L803 (FEADR Intervention No. 1) – Environmental protection and climate change mitigation…
Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.
or call us directly on 0755 167 167
Other programmes
e-DRIVE — replacing the fleets of businesses and passenger transport vehicles with zero-emission vehicles
A scheme of 56.9 million euro from the Modernisation Fund. It funds up to 100% of eligible costs for M1, M2 and M3 electric vehicles replacing polluting vehicles. The scheme has been approved (OMTI 742/2026, 817/2026), but the guide and the calls have not yet been published.
Call window openModernisation Fund — stand-alone battery storage installations
The Ministry of Energy is offering 150 million euro from the Modernisation Fund for new stand-alone battery storage installations owned by companies with CAEN code 35. The aid covers up to 100% of eligible costs, with a maximum of 69,000 euro/MWh and 15 million euro per company.
Opening soone-MOVE RO — charging infrastructure for zero-emission mobility
Non-refundable state aid of 262 million euro from the Modernisation Fund for electric charging stations for fleets and the public, with photovoltaics and storage. It is awarded through competitive tenders. The scheme has been approved, but the call has not yet been launched.