Skip to content
Todos & Company
Opening soon

PR Bucharest-Ilfov 3.3 — construction of new public NZEB+ buildings (call PR BI P3/3.3/1/2026)

A competitive PR Bucharest-Ilfov call worth €8,945,000, of which €3,578,000 from the ERDF, for new demonstrative public NZEB+ buildings. City halls, the Bucharest sectors and public institutions in the region can apply. The call is expected to open in October 2026.

Who can apply
The UAT of towns and communes in Ilfov county, Bucharest Municipality and the Capital's sectors
Total budget
€8,945,000, of which €3,578,000 from the ERDF
Submission period
estimated from October 2026 to March 2027 (the exact dates have not been announced)

Checked against official sources on · funder: ADR Bucharest-Ilfov · official source

The guide has not been published yet, but good applications are built before launch. Those who start when the call window opens usually miss out on it.

PR Bucharest-Ilfov 3.3: €8.945 million for new NZEB+ public buildings, opening estimated in October

Who can apply

The local authorities (UAT) of the towns and communes of Ilfov county, Bucharest Municipality and the Capital's sectors. Central or local public institutions can also apply, as can partnerships between these entities and intercommunity development associations (ADI). Private companies are not eligible applicants; they can only take part as designers, consultants or builders, through public procurement.

What it covers

  • Construction of new public buildings with energy performance above the NZEB standard
  • Public buildings with a demonstration role, in line with the principles of the New European Bauhaus
  • Solutions offering architectural quality, sustainability and accessibility for the community, in line with the programme's NEB methodology
Full analysis PR Bucharest-Ilfov 3.3: €8.945 million for new NZEB+ public buildings, opening estimated in October Conditions, steps and pitfalls, with official sources →

We prepare your application before the window opens

  1. We analyse whether you qualify and under which programme exactly.
  2. We build the application: business plan, budget, supporting documents.
  3. We submit during the call window and follow the evaluation.
  4. We stay with you through the reimbursement file and final payment.

Frequently asked questions

Is the PR BI P3/3.3/1/2026 call for NZEB+ public buildings open now?

No. As of 3 October 2026, the call is listed as "in preparation" on the ADR Bucharest-Ilfov website. The public consultation on the guide ended on 4 September 2026, and the ADR calendar estimates opening in October 2026 and closing in March 2027.

What is the budget of the call for new NZEB+ public buildings in Bucharest-Ilfov?

The total budget of the PR BI P3/3.3/1/2026 call is €8,945,000, of which €3,578,000 comes from the European Regional Development Fund (ERDF). The maximum value per project will be set in the final guide.

Can the communes in Ilfov apply too?

Yes. The ADR Bucharest-Ilfov calendar lists the UAT of communes among the eligible applicants. Alongside them, towns, Bucharest Municipality, the Capital's sectors, central or local public institutions, partnerships between them and ADIs can apply.

Can a private company obtain funding through the NZEB+ call of PR Bucharest-Ilfov?

Not directly. The call is intended for public authorities and institutions. Design, construction or consultancy firms can work on projects only as suppliers, under public procurement contracts.

What does NZEB+ mean in this call?

NZEB+ means new public buildings with energy performance above the NZEB standard, that is, above the level of nearly zero-energy buildings. The projects have a demonstration role and must also comply with the programme's New European Bauhaus methodology: architectural quality, sustainability and accessibility for the community.

How is the project submitted and where can I find the guide?

Submission will be made through MySMIS2021, after the final guide is published. The August 2026 guide and annexes, as well as the earlier March 2026 version, are published on the call page on regiobucuresti-ilfov.ro, in PDF and editable formats.

How long does it take to prepare the application?

It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.

What happens if I do not qualify?

We tell you before any contract is signed, and if another suitable programme exists, we point you to it.

Next step

We prepare your file until it opens — PR Bucharest-Ilfov 3.3 — construction of new NZEB+ public buildings (call PR BI P3/3.3/1/2026)

Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.

or call us directly on 0755 167 167