Skip to content
Todos & Company

Try

Write in your own words: the search understands the meaning of your question, not just the exact words.

0755 167 167 Check eligibility
Call closed

CEF Energy CB RES — cross-border renewable energy project status (6th call)

CINEA is accepting applications for CB RES status until 6 October 2026, 17:00 (Brussels time). The status does not bring money directly. Without it, however, cross-border renewable projects cannot apply for CEF Energy funding for works and studies.

Who can apply
Promoters of renewable energy projects built under a cooperation mechanism between two…
Funding amount
CB RES status does not bring money directly
Submission period
29 June 2026 – 6 October 2026, 17:00 (Brussels time)

Checked against official sources on · funder: European Climate, Infrastructure and Environment Executive Agency · official source

Call window closed 99-day window

This call window has closed. Most programmes reopen — we will notify you in good time and prepare your application before it does.

CEF Energy CB RES: the last call for cross-border green energy project status, until 6 October

Who can apply

Promoters of renewable energy projects built on a cooperation mechanism between two or more Member States, or between Member States and third countries (Articles 8, 9, 11 and 13 of Directive (EU) 2018/2001), can apply. The file must contain either a signed cooperation agreement or written statements by which the participating states support the project. The main element of the project must be a renewable energy production installation. Through a cost-benefit analysis, the project must show that it brings greater net socio-economic benefits than a national project.

What it covers

  • Obtaining official CB RES status and inclusion on the list of CB RES projects adopted by the European Commission
  • The right to later apply for funding for works and studies from the CB RES window of CEF Energy (the last funding call of the 2021–2027 period is expected in 2027)
  • Eligible technologies: onshore and offshore wind, solar, sustainable biomass, ocean energy, geothermal or hybrid solutions
  • Components that can be included: grid connection, co-located storage, electrolysers directly connected to the renewable installation, as well as heating, cooling and power-to-gas
  • Cannot be included: electricity transmission infrastructure (including converters), interconnection lines, hydrogen transport and storage infrastructure, and storage connected to high-voltage lines (110 kV or more)
  • Additional benefits: greater visibility at EU level, stronger support from Member States, more confidence from investors

Free assessment · 2 minutes

Check whether your company qualifies

Enter your CUI (tax ID): we will show you instantly whether CEF Energy CB RES — cross-border renewable energy project status (6th call) applies in your company's county and field, and then a consultant will call you free of charge.

When should we call you?

96% of the projects we have submitted have been approved. The assessment does not commit you to anything. Or call: 0755 167 167

Full analysis CEF Energy CB RES: the last call for cross-border green energy project status, until 6 October Conditions, steps and pitfalls, with official sources →

We will notify you of the next round

  1. We analyse whether you qualify and under which programme exactly.
  2. We build the application: business plan, budget, supporting documents.
  3. We submit during the call window and follow the evaluation.
  4. We stay with you through the reimbursement file and final payment.

Frequently asked questions

Until when can you apply for CB RES status in the 2026 call?

Applications for the 6th CB RES call must be submitted by 6 October 2026, 17:00 (Brussels time). Submission is made on the dedicated CB RES platform, with an EU Login account. The call opened on 29 June 2026.

Does CB RES status bring in money directly?

No. CB RES status does not come with direct funding. Without it, however, a project cannot apply for funding for works and studies from the CB RES window of CEF Energy. For projects that receive the status in this call, the last funding call for works and studies is expected in 2027.

Which projects can obtain CB RES status?

Renewable energy projects built on a cooperation mechanism between at least two Member States, or between Member States and third countries, can obtain the status. The main element must be renewable energy production: wind, solar, sustainable biomass, ocean energy, geothermal or hybrid solutions. Through a cost-benefit analysis, the project must show that it has greater net socio-economic benefits than a national project.

What documents must be submitted for CB RES status?

The file has four mandatory annexes: (1) the CB RES CBA tool, (2) the annex to the application form with the CBA report, (3) the written statement of the participating states or the signed cooperation agreement, and (4) the sustainability and DNSH compliance file.

What cannot be part of a CB RES project?

Electricity transmission infrastructure and converters, interconnection lines, hydrogen transport and storage infrastructure, and storage connected to high-voltage lines (110 kV or more) cannot be included.

Are there projects involving Romania that have CB RES status?

Yes. On 1 October 2026, the European Commission granted CB RES status to the WIND project. It is a 650 MW onshore wind farm near Poltavska, developed by Ukraine and Romania. The CB RES list now has 15 projects.

How long does it take to prepare the application?

It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.

What happens if I do not qualify?

We tell you before any contract is signed, and if another suitable programme exists, we point you to it.

Funding alerts · free

Not the right programme? Get alerts for your company

Enter your CUI (tax ID): once a month or every two weeks, we will send you the programmes that are open or opening for your company's county and field. Free of charge, and you can unsubscribe at any time.

Emails come from alerte@todos-company.ro; replies go to our consultants.

Next step

We will notify you at the next round — CEF Energy CB RES — cross-border renewable energy project status (6th call)

Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.

or call us directly on 0755 167 167