PRO INFRA: up to €15 million for infrastructure materials producers, call not yet launched
The PRO INFRA scheme under the Modernisation Fund provides up to €15 million per beneficiary for energy-efficient machinery for infrastructure material producers. The budget has fallen to €100 million, and the call has not been launched.
Todos & Company editorial team · EU funding consultancy since 2006
PRO INFRA is the state aid scheme of the Ministry of Transport and Infrastructure, funded from the Modernisation Fund. Through it, companies that produce raw materials, materials and products for transport infrastructure (aggregates, concrete, precast elements, metal structures, cables) can receive grants of up to 15 million euro per beneficiary to replace old machinery with energy-efficient equipment. The scheme was approved by OMTI no. 2292/2025, published in the Official Gazette no. 20 of 14 January 2026. In February 2026, the budget was reduced to 100 million euro. As of 27 September 2026, the applicant's guide and the timetable for the first call window had not been published.
In brief
- Programme: "PRO INFRA" state aid scheme, Modernisation Fund, Key Programme 9 (energy efficiency in transport)
- Authority: Ministry of Transport and Infrastructure, through the General Directorate for European Transport Programmes
- Beneficiaries: micro-enterprises, SMEs and large enterprises operating under one of the eligible CAEN codes
- Total budget: €100 million, with an average annual budget of no more than €90 million (OMTI no. 101/2026). The budget was originally €200 million.
- Value per project / intensity: maximum €15 million per beneficiary, cumulatively across all call windows, and an intensity of up to 100% of eligible costs
- Selection: competitive bidding procedure; what mainly counts is the aid requested for each MWh saved
- Submission period: not yet announced
- Status: the scheme has been approved and amended, but the applicant's guide and the call have not been published
What has happened since the public consultation
The ministry put the scheme out for public consultation between 28 November and 9 December 2025. In the consultation, the proposed budget was €200 million, with an annual average of no more than €100 million. The final version was approved by OMTI no. 2292/2025 and published on 14 January 2026. Through OMTI no. 101/2026, published in the Official Gazette no. 119 of 12 February 2026, the total budget fell to €100 million, with an annual average that will not exceed €90 million.
In September 2026, the ministry published guides and amendments for other Modernisation Fund schemes (e-Mobility RO, e-DRIVE, e-MOVE RO, zero-emission vehicles). No new announcement has appeared for PRO INFRA. As a result, applications cannot yet be submitted.
Who can apply?
Companies of any size can apply, provided they are registered with the Romanian Trade Register by the date of the first payment at the latest. The funded activity must fall within the list of CAEN codes in Annex 2 of the scheme. In the version put out for consultation, the list included, among others:
- extraction of stone, gravel and sand (0811, 0812);
- refractory products, lime, concrete products, concrete and mortars (2320, 2352, 2361, 2363, 2364, 2369);
- cold drawing of bars, cold-formed sections, wire drawing (2431–2434);
- metal structures (2511) and electric wires and cables (2732).
The final list is the one in the annex to the order published in the Official Gazette. Check it there before relying on a particular code.
Conditions for the applicant, according to the text of the scheme:
- the company is not in difficulty or in insolvency;
- has no debts to the consolidated budget;
- the ratio of total debt to equity in the last financial year is positive and below 7.5. If this condition is not met, a creditworthiness or comfort letter from the bank is mandatory.
Only one project may be submitted for each location.
Which investments and costs are eligible?
The scheme funds only investments directly linked to improving energy efficiency:
- replacing production installations, machinery and equipment with state-of-the-art, energy-efficient alternatives;
- replacing internal combustion machinery with electric machinery;
- an integrated energy management system (EMS). The EMS is mandatory in every project.
The costs of purchasing and installing new equipment and the EMS are eligible. VAT is not eligible. The project must start from an energy audit for the last completed calendar year, signed by a certified auditor. The old equipment must be scrapped within 30 days of receiving the new equipment. Implementation must be completed by 30 June 2030, and the investment must be maintained for 5 years after completion.
How is selection carried out?
There is no traditional qualitative evaluation. Selection works like an auction:
- 90 points are awarded according to the aid requested for each MWh of electricity saved. The lowest value receives 90 points, the highest receives 0, and values in between are calculated linearly.
- 10 points are awarded if the production process or machinery uses renewable energy, in part or in full.
Projects are funded in order of score until the call window's budget is exhausted. In the event of a tie, the project with the higher value takes priority. The criteria must be published at least six weeks before the submission deadline.
What this means for your business
Our recommendation is to use the period without a call for preparation now, because submission deadlines in the Modernisation Fund are usually short:
- The energy audit is the centrepiece. All calculations start from the MWh saved. A weak audit, with underestimated savings, puts you at the bottom of the ranking. An overestimated one becomes a risk at monitoring, because the EMS checks the results every year.
- Do not start the investment. Any firm order signed before the application is submitted makes the project ineligible (the incentive effect).
- Ask for less than the maximum. The aid per MWh saved decides 90% of the score. A substantial own contribution can move you up the ranking.
- Take the European timetable into account. The General Block Exemption Regulation (GBER) expires on 31 December 2026. According to the scheme, after that date contracts can be signed only if the scheme is aligned with the new regulation. Delays or changes may therefore occur.
The scheme is particularly suited to quarries, concrete plants, precast factories and metal fabrication workshops that have old, high-consumption machinery and can document the energy savings. If you are not sure that your activity qualifies, use the eligibility check or follow the programme page: PRO INFRA.
Frequently asked questions
Can I submit a funding application through PRO INFRA now?
No. On 27 September 2026, the Ministry of Transport had not published the applicant's guide or the call window timetable. The submission period will be announced on the ministry's website.
What is the budget of the PRO INFRA scheme?
The total budget is 100 million euro, with an average annual budget of no more than 90 million euro, under OMTI no. 101/2026. The scheme originally had 200 million euro.
What percentage of the investment does the grant cover?
The intensity can reach 100% of eligible costs, but no more than 15 million euro per beneficiary. VAT and ineligible costs remain the company's responsibility. Because selection is by auction, applications requesting less aid per MWh saved receive a higher score.
Can I combine PRO INFRA with other state aid or de minimis aid?
Not for the same eligible costs. The scheme prohibits combining it with any other state aid, including de minimis aid, for the same costs.
Can I buy second-hand machinery?
No. Installations, machinery and equipment must be new and of a new generation at the time of the application, and the equipment being replaced must be scrapped.
Official sources
- MTI – Public consultation on the "PRO INFRA" state aid scheme (28 November 2025)
- Text of the "PRO INFRA" scheme put out for consultation (PDF)
- MTI – Updating the budgets for the "e-DRIVE" and "PRO INFRA" schemes (16 February 2026)
- OMTI no. 100/2026 and no. 101/2026 – Official Gazette no. 119/12.02.2026 (PDF)
- MTI – Modernisation Fund announcements
Information checked on 27 September 2026. Conditions may be amended by the managing authority — check the guide in force before submitting.