PR South-West Oltenia — county roads connected to TEN-T (call 2, SO 3.2, guide in consultation)
ADR South-West Oltenia has put the guide for the second call "Regional connectivity and improved access to TEN-T" out for public consultation (15 October – 6 November 2026): 24,096,385 euro for the county councils of Dolj, Gorj, Olt, Mehedinți and Vâlcea, with projects of 5–20 million euro including VAT.
- Who can apply
- The county councils of Dolj, Gorj, Olt, Mehedinți and Vâlcea, individually or in partnership with other…
- Total budget
- 24,096,385 euro
- Funding amount
- Eligible value per project between 5 and 20 million euro, including VAT
- Submission period
- submission not yet announced (public consultation on the guide: 15 October 2026 – 6 November 2026)
Checked against official sources on · funder: ADR South-West Oltenia · official source
The guide has not been published yet, but good applications are built before launch. Those who start when the call window opens usually miss out on it.
Who can apply
The county councils of Dolj, Gorj, Olt, Mehedinți and Vâlcea, individually or in partnership with other local public authorities. The investment must concern a county road with a direct or indirect link to the Trans-European Transport Network (TEN-T).
What it covers
- Construction of county roads with a direct or indirect link to TEN-T
- Rehabilitation of county roads linked to TEN-T
- Modernisation of county roads linked to TEN-T
- Extension of county roads providing the link to the Trans-European Transport Network
We prepare your application before the window opens
- We analyse whether you qualify and under which programme exactly.
- We build the application: business plan, budget, supporting documents.
- We submit during the call window and follow the evaluation.
- We stay with you through the reimbursement file and final payment.
Frequently asked questions
Can projects be submitted now for the county roads in Oltenia (call 2, SO 3.2)?
No. As of 19 October 2026 the call is in preparation: on 15 October 2026 ADR South-West Oltenia published the applicant's guide for public consultation, with a deadline for comments of 6 November 2026. The submission period for funding applications has not been announced, and call 2 does not yet appear in the list of launched calls of the South-West Oltenia Regional Programme 2021–2027.
What is the budget of the second call "Regional connectivity and improved access to TEN-T"?
The allocation officially announced by ADR South-West Oltenia is 24,096,385 euro, from EU funds through the South-West Oltenia Regional Programme 2021–2027, Priority 5, Specific Objective 3.2, Action A.
Who can apply to the call for county roads connected to TEN-T in Oltenia?
The county councils of Dolj, Gorj, Olt, Mehedinți and Vâlcea, individually or in partnership with other local public authorities. The investment must target county roads with a direct or indirect link to the Trans-European Transport Network (TEN-T).
What are the minimum and maximum values of a project?
The eligible value of a project must be between 5 and 20 million euro, including VAT. With an allocation of 24,096,385 euro, at most four projects can be funded.
What types of works are funded?
Construction, rehabilitation, modernisation and extension of county roads providing a direct or indirect link to the TEN-T network. The detailed list of eligible activities is in the applicant's guide published for consultation (the GS-anexe-Drumuri-judetene.zip archive on adroltenia.ro).
How and by when can comments on the guide under consultation be sent?
Proposals and comments are to be sent by 6 November 2026 to office@adroltenia.ro and help-desk@adroltenia.ro. The guide and annexes can be downloaded from the ADR South-West Oltenia website.
How long does it take to prepare the application?
It depends on the complexity of the project and the documents you already have. The first step is the eligibility analysis, which tells you what needs to be prepared.
What happens if I do not qualify?
We tell you before any contract is signed, and if another suitable programme exists, we point you to it.
Next step
We prepare your application until the call opens — PR South-West Oltenia — county roads connected to TEN-T (call 2, SO 3.2, guide in consultation)
Fill in the form and we will tell you whether you qualify. If you do not qualify under this programme, we will tell you which other one you could apply for — or that there is none, if that is the case.
or call us directly on 0755 167 167
Other programmes
Modernisation Fund — solar with storage and batteries for town halls and public institutions
Two calls under the Modernisation Fund, worth €650 million, for public entities: €500 million for solar with integrated storage for self-consumption and €150 million for new storage. The aid covers up to 100%, with a maximum of €10 million per beneficiary. Submit to AFIR by 20 November 2026.
Call window openPR South-West Oltenia — developing tourism in rural resort communes
Call 2 of the PR South-West Oltenia for rural tourism has 5,882,353 euro for communes with tourist resort status, county councils and their partnerships. A project may be worth between 500,000 and 4,000,000 euro. Applications are accepted until 27 November 2026, 12:00.
Call window openPDDTJ Prahova — energy renovation of residential blocks of flats
Local authorities (UAT) in Prahova can obtain between 200,000 and 15,000,000 euro in non-refundable funding per project for the energy renovation of blocks of flats. The budget is 18.68 million euro (PDDTJ). Applications must be submitted by 3 February 2027, 17:00.